YMCA of Greater Cleveland
Parker Hannifin Downtown Branch
Cleveland, Ohio

Tec Inc. completed HVAC, Plumbing, Electrical engineering, Lighting and Technology Design for the renovation of a portion of The Galleria, a retail mall into the new 40,000 square foot Parker Hannifin Downtown Y that is tentatively scheduled to open March 2016.  This facility will service the growing downtown population. 

There are two significant considerations for the engineering in this project. First, the connection of plumbing and electrical service to the existing building infrastructure. HVAC equipment for the YMCA is new and wil have no bearing on the existing building. The second consideration is keeping the pool’s extreme environmental conditions of heat and humidity confined to that area. 

The new YMCA features:

  • Three-lane lap pool
  • Sauna
  • Steam Room
  • Hot Tub
  • Spinning Studio
  • Hot Yoga Studio
  • Message Therapy Rooms
  • Fitness Areas with state-of-the-art cardio and strength equipment
  • Locker Facilities
  • Large lobby fofor social gathering
  • HealthSpan Clinic with on-site physician

This project has been featured in Properties Magazine. Read the article here.